Commercial photocells
Commercial electrical work gets judged on two things: does it pass, and did it delay the trade behind you. Quik Wire Electric handles photocells across Des Plaines and 24 Illinois counties. Licensed, insured, permitted where it needs to be.
- Licensed
Illinois electrical contractor license. The work passes inspection.
- Insured
Full coverage on every job, residential through municipal.
- 24/7
No power, burning smell, breaker that will not hold. We answer.
- Permits pulled
Where the village requires one we file it and meet the inspector.

What photocells involves
Commercial electrical work gets judged on two things: does it pass, and did it delay the trade behind you. The work starts with finding out what is actually there. With photocells, that means looking at the existing wiring, the panel capacity and whatever the last person left behind.
Honest answer first. If what you have is fine, we say it is fine. If it needs work, we tell you how much and why, with the urgent parts separated from the ones that can wait.
Where this comes up
Build-outs, tenant work, lighting and three-phase power for buildings that cannot go dark. Most of these calls come from Des Plaines and the surrounding suburbs, but we take them anywhere in our service area.
Insulation is the quiet problem. Cloth-wrapped conductors from decades ago go brittle inside the box, and they crack the moment somebody moves them to swap a switch. A small job becomes a careful one, so we check before we promise a time.
How we do it
The electrician who quotes the job comes from the same crew that does it. We work to the current code, test every circuit before we leave and label the panel so the next person can read it.
Why this is worth doing properly
For a business, a shortcut in the electrical shows up as downtime. A circuit that trips during the busiest hour or a cooler that loses power overnight can cost more than the original job did. Getting the load calculation right and every connection tight at install is what prevents that, and it is the part of the work customers never see.
The cost of doing it right the first time is almost always lower than the cost of doing it twice. We would rather tell you the job is bigger than you hoped than come back in two years.
Scheduling and how long it takes
Once a job is booked, the work itself usually goes quickly. The waiting, when there is any, comes from permit offices and ComEd scheduling, which is why a service change takes longer to start than a repair does.
What we promise on timing is what we can actually deliver. If a date depends on somebody else, we say so at the quote and give you a range instead of a day we cannot guarantee.
Code, permits and inspection
Generators and transfer switches draw extra attention from inspectors, because a bad install can push power back into the utility lines. Expect a permit and an inspection on those even in places that are relaxed about smaller work, and expect us to handle both.
We deal with whichever jurisdiction the job sits in. We pull the permit, we schedule the inspection, and we are there when the inspector walks it. You get the paperwork at the end, which matters when you sell the building or when an insurer asks.
Materials and why they matter
Devices are not all the same. A fifty-cent backstabbed outlet holds the conductor with a spring clip; a commercial-grade one clamps it under a screw plate. The second kind is a couple of dollars more and it is the reason the connection is still tight in fifteen years.
We use commercial-grade devices as standard. It is a small share of the job cost and it is the part most likely to fail if you go cheap on it.
What to do before we arrive
Leave the panel cover on. Flipping a breaker is fine. Taking the dead front off to look inside is not, because the service conductors at the top stay live even with the main off. We will open it when we get there.
Write down when the problem started and what else was running at the time. Those two details save a lot of searching.
We tell you what is wrong before we tell you what it costs.
How the job runs
- Step 1
Call
Call and explain the problem to someone who does the work. You get a straight read on urgency right away.
- Step 2
Diagnose
We find the actual fault. Not a guess, and not a rewire you did not need.
- Step 3
Price
You get the number before the work starts, in writing.
- Step 4
Permit
Where the village requires one, we pull it. That is on us, not on you.
- Step 5
Install
Licensed and insured, to code, cleaned up behind us.
- Step 6
Inspect
We meet the inspector and we sign off. You get the documentation.
Other commercial work
Related services we handle with the same crew.
- Commercial electrical installationBuild-outs, tenant work, lighting and three-phase power for buildings that cannot go dark.
- Commercial electrical repairBuild-outs, tenant work, lighting and three-phase power for buildings that cannot go dark.
- Commercial electrical maintenanceBuild-outs, tenant work, lighting and three-phase power for buildings that cannot go dark.
- Commercial electrical troubleshootingBuild-outs, tenant work, lighting and three-phase power for buildings that cannot go dark.
- Commercial electrical inspectionsBuild-outs, tenant work, lighting and three-phase power for buildings that cannot go dark.
- Commercial electrical build-outsBuild-outs, tenant work, lighting and three-phase power for buildings that cannot go dark.
- Tenant improvementsBuild-outs, tenant work, lighting and three-phase power for buildings that cannot go dark.
- Commercial remodelingBuild-outs, tenant work, lighting and three-phase power for buildings that cannot go dark.

Photocells, done on the record
Every job goes on the record. A permit filed where the village asks for one, an inspection passed, and a licensed, insured electrician doing the work.
Photocells questions
Do you handle photocells in Des Plaines?
Yes. Photocells is work we do regularly out of our Des Plaines shop, and we cover 24 counties across Illinois. Call and we will tell you when we can be there.
Is the work permitted and inspected?
Permitted work is inspected work, and we treat both as part of the job. You do not have to call the village yourself. We do, and you get the paperwork afterward.
How soon can you start?
Sooner than most people expect. A safety issue gets someone out the same day. Planned work typically starts in a few days, depending on parts and any permit.
Are you licensed for this?
Yes, with an Illinois electrical contractor license and insurance. That covers every job we take, from a single outlet to municipal work.
What does it cost?
We do not give a price over the phone for work we have not seen, because a number like that is a guess. Once we have looked, you get a written price, and that is the price unless the job itself changes.
Where we work
We cover 527 municipalities across 24 counties.
- Des Plaines, ILPhotocells in Des Plaines and the rest of Cook County.
- Niles, ILPhotocells in Niles and the rest of Cook County.
- Hoffman Estates, ILPhotocells in Hoffman Estates and the rest of Cook County.
Need photocells?
Call (224) 245-6038. You get an electrician, not a call center.
Need it booked? Start with the contact form. Want proof first? Our job photos are here.