
Substations
A service that was right in 1968 is undersized now. Quik Wire Electric handles substations across Des Plaines and 24 Illinois counties. Licensed, insured, permitted where it needs to be.
- Licensed
Illinois electrical contractor license. The work passes inspection.
- Insured
Full coverage on every job, residential through municipal.
- 24/7
No power, burning smell, breaker that will not hold. We answer.
- Permits pulled
Where the work needs a permit, it gets one, and it passes inspection.

What substations involves
A service that was right in 1968 is undersized now. The work starts with finding out what is actually there. With substations, that means looking at the existing wiring, the panel capacity and whatever the last person left behind.
Plenty of calls end with a smaller bill than people braced for. A tripping breaker is often a single bad device, and a dead outlet is often a loose wire two boxes away.
Where this comes up
Services, switchgear, transformers and the distribution behind the meter. Most of these calls come from Des Plaines and the surrounding suburbs, but we take them anywhere in our service area.
Ungrounded two-wire circuits are still common, along with three-prong outlets installed on top of them with no ground behind the plate. The outlet looks right. The tester says otherwise, and that changes how the job is planned.
How we do it
We show up when we said we would and explain the work before we start. Permits get pulled where they are required, and the job is not finished until it passes inspection.
Why this is worth doing properly
Electrical problems are slow. A loose termination can heat and cool thousands of times before it finally fails, and by then the damage is inside the box, the insulation and sometimes the framing around it. Proper work is about the long run: wire sized correctly for the load and every connection made the way the manufacturer and the code intend.
The cost of doing it right the first time is almost always lower than the cost of doing it twice. We would rather tell you the job is bigger than you hoped than come back in two years.
Scheduling and how long it takes
Most scheduled jobs start within a few days. Anything needing a village permit or a utility disconnect waits on those offices, and we will tell you up front how long that usually takes. Emergencies skip the line and get same-day attention.
If you are coordinating with other trades, tell us early. Rough-in has to happen before insulation and drywall, and the inspection has to happen before the walls close. We fit into that sequence rather than holding it up.
What the permit actually buys you
A permit puts the work on the public record for the address. When the building changes hands, that record is evidence the electrical was done and checked. Without it, a buyer's inspector treats everything they find as suspect.
It also means the work was sized and installed to the code edition in force, not to whatever was normal when the building went up.
Grounding and bonding
Grounding is the part nobody sees and the part that decides whether a fault clears safely. The ground path has to be continuous and low-impedance from every device back to the service, and the neutral and ground can only be bonded together in one place.
A neutral bonded to ground in a subpanel is one of the most common defects we find. It works right up until it does not, and then it puts current on metal that people touch.
What to do before we arrive
Leave the panel cover on. Flipping a breaker is fine. Taking the dead front off to look inside is not, because the service conductors at the top stay live even with the main off. We will open it when we get there.
Do not try to open the panel or take a device apart. Just tell us what you noticed and when, and we will take it from there.
Service size is a ceiling on everything
The service is the limit every other circuit lives under. A 100-amp service was generous when houses had one air conditioner and a gas range. Add electric cooking, a heat pump, a car charger and a finished basement and it stops being enough.
Upgrading means coordinating with ComEd, replacing the meter socket and mast, and sizing the new panel for what the building will need in ten years rather than exactly what it needs today.
We tell you what is wrong before we tell you what it costs.
How the job runs
- Step 1
Call
Call and talk it through with a licensed electrician. We will be honest about how serious it sounds.
- Step 2
Diagnose
We find the actual fault. Not a guess, and not a rewire you did not need.
- Step 3
Price
You get the number before the work starts, in writing.
- Step 4
Permit
Where the village requires one, we pull it. That is on us, not on you.
- Step 5
Install
Licensed and insured, to code, cleaned up behind us.
- Step 6
Inspect
We meet the inspector and we sign off. You get the documentation.
Other power work
Related services we handle with the same crew.
- Electrical service installationServices, switchgear, transformers and the distribution behind the meter.
- Service electrical service upgradesServices, switchgear, transformers and the distribution behind the meter.
- Electrical service replacementServices, switchgear, transformers and the distribution behind the meter.
- Electrical service repairsServices, switchgear, transformers and the distribution behind the meter.
- Utility service connectionsServices, switchgear, transformers and the distribution behind the meter.
- Electrical meter installationServices, switchgear, transformers and the distribution behind the meter.
- Main disconnectsServices, switchgear, transformers and the distribution behind the meter.
- Main service panelsServices, switchgear, transformers and the distribution behind the meter.

Substations, done on the record
The paperwork is part of the work. Permits where required, an inspection at the end, and a licensed, insured electrician in between.
Substations questions
Do you handle substations in Des Plaines?
Yes. Substations is work we do regularly out of our Des Plaines shop, and we cover 24 counties across Illinois. Call and we will tell you when we can be there.
Is the work permitted and inspected?
When a permit is required, we handle it from start to finish. The inspection is part of the job, and you keep the signed-off documentation for your records.
How soon can you start?
Emergencies get same-day attention. Scheduled work usually starts within a few days, depending on parts and on whether a permit has to clear first.
Are you licensed for this?
Yes. Quik Wire Electric holds an Illinois electrical contractor license and carries insurance. Every electrician on the job works under that license.
What does it cost?
Every job gets priced on its own. A dead outlet, a new 240V circuit and a service upgrade have very little in common on the bill. We look at yours, write down the price, and hold to it unless the scope moves.
Where we work
We cover 527 municipalities across 24 counties.
- Des Plaines, ILSubstations in Des Plaines and the rest of Cook County.
- Glenview, ILSubstations in Glenview and the rest of Cook County.
- Northbrook, ILSubstations in Northbrook and the rest of Cook County.
Need substations?
Call (224) 245-6038. You get an electrician, not a call center.
Want to see the work first? Look through the gallery, or tell us what is happening.